Norwell, MA Installs Two GAC and IX Compatible Systems to Meet PFAS6 Guidelines
Cottage Grove Municipal Treatment System
|
Project Location: Cottage Grove, MN
Project Description: The AV team provided three 12-foot diameter model 12-1340 GAC/IX (dual media capable) systems with using the Norit 1240PLUS GAC approved by the Minnesota Department of Health. |
Severe Drought Impacts Ability of Zone 7 Water Agency to Meet Proposed 20 ppt pfhxs Levels
Project Location: Pleasanton, CA
Project Description: AV designed, manufactured, delivered, offloaded, and assembled three (3) 12-520 LowPro® IX systems, on-site process pipe, resin, prefiltration equipment meeting NSF 61 standards. |
GAC Systems Help Municipalities and Utilities Protect Water Users in Norwalk, CA
Project Location: Norwalk, California
Project Description: AV designed, manufactured, delivered, offloaded, and assembled two (2) PF 12-520 GAC systems for drinking water, two (2) Fil-Trek Cartridge Filters and the above ground site pipe connecting the filters, meeting NSF 61 standards. |
Central California Winery Removes 1,2,3-TCP from Well Water Using Granular Activate Carbon
Project Location: Central California
Project Description: Designed, manufactured and delivered two (2) 12-ft. diameter and delivered two (2) 10-ft. diameter GAC systems. |
City of Tucson Treatment Plant Expansion
Project Location: Tucson, AZ
Project Description: Designed, manufactured and delivered two (2) 12-ft. diameter GAC systems. |
Treatment Train Removes 1,2,3-TCP and Nitrates in Monte Vista Water District
Project Location: Monte Vista, CA
Project Description: Designed, manufactured, delivered, offloaded and assembled six (6) PF 10-820 GAC systems for drinking water, meeting NSF 61 standards. |
City of Lodi Employs GAC to Remove Contaminants From Groundwater
Project Location: Lodi, CA
Project Description: Designed, manufactured and delivered four (4) PF12-520 GAC Systems (12-ft. diameter vessels GAC lead-lag pair for drinking water meeting NSF 61 standards). |
Town of Marana PFAS Removal Treatment Plant
Project Location: Marana, AZ
Project Description: Designed, manufactured and delivered four (4) PF12-520 GAC Systems (12-ft. diameter vessels GAC lead-lag pair for drinking water meeting NSF 61 standards). |
Shaw Air Force Base uses IX for PFAS Removal
Project Location: Oakland, SC
Project Description: Designed, manufactured, delivered, and installed one (1) of our PF12-520 IX Systems (a 12-ft.-diameter vessel IX lead-lag pair for drinking water meeting NSF 61 standards). |
City of Orange PFAS Treatment System
Project Location: Orange, NJ
Project Description: Designed, manufactured, delivered and installed one (1) of our PF12-520 IX Systems which is a 12-ft.-diameter vessel IX lead-lag pair for drinking water meeting NSF 61 standards. |
Yorba Linda Ion Exchange Treatment Plant for PFAS
Project Location: Yorba Linda, CA
Project Description: Designed, manufactured, and delivered eleven (11) of our PF12-520 IX Systems which is a 12-ft.-diameter vessel IX lead-lag pair for drinking water meeting NSF 61 standards. |
San Gabriel Valley Water Company W6 PFAS Removal
Project Location: Whittier, CA
Project Description: Designed, manufactured, delivered, offloaded, set, and assembled three 12-foot diameter ion exchange resin systems for PFAS Removal. |
Eastern Municipal Water District Well 59 PFAS Removal
Project Location: Perris, CA
Project Description: Designed, manufactured, delivered, and installed two 10‐foot diameter GAC systems for PFAS removal. |
California Water Services for TOC Removal
Project Location: Kernville, CA
Project Description: Design, fabricate, and install one 10-foot diameter GAC system to address TOC removal. |
Manufacturing Partner for a Southern CA Aerospace Defense Water Treatment Facility
Project Location: Southern California
Project Description: AV provided system design, manufacture, and supply of four large 12-foot diameter systems with a combined 320,000 pounds of GAC. |
1,2,3-Trichloropropane (TCP) Mitigation Project
Project Location: Tulare, CA
Project Description: Design, manufacture, and supply four Low Pro 12-foot diameter 40,000-pound GAC systems. |
Per-Fluorinated Chemical Treatment System
Project Location: Stuart, FL
Project Description: Design, fabricate, and install two 12-foot diameter ion exchange systems for PFAS removal. |
Margarita Well #2 GAC Treatment Facility
Project Location: San Dimas, CA
Project Description: Design, fabricate, and install one patent pending Low Profile 12-foot diameter GAC system for 1,2,3-TCP removal. |
Department of Energy TOC Removal Project
Project Location: Northern California
Project Description: Design, fabricate, and install one 8-foot diameter GAC system, system header and bypass piping, activated carbon media, and chemical feed systems. |
Chino Basin VOC Plant Design Build Project
Project Location: Pomona, CA
Project Description: Four 12-foot diameter GAC systems, system header and bypass piping, and activated carbon media for 1,2,3-TCP/VOC removal. |
Nut Plains PFOA/PFOS Well Treatment System
Project Location: Rancho Cordova, CA
Project Description: Two 10-foot diameter Ultra Low Profile GAC systems, system header, and bypass piping for PFAS removal. |
Dunnigan WTP Using Ion-Exchange for Chrome VI
Project Location: Dunnigan, CA
Project Description: Supply and installation of prefiltration equipment, fabricated steel and PVC manifold piping, ion exchange vessels, and sensors for controls monitoring. |
Groundwater Remediation at Vandenberg AFB
Project Location: Lompoc, CA
Project Description: Supply and installation of 8-foot diameter GAC system. |
Plant F-21 Single Pass Ion Exchange System
Project Location: Fontana, CA
Project Description: Custom design and fabrication of 8" to 18" diameter steel pipe. |
Monterey Peninsula Water Supply Project
Project Location: Monterey, CA
Project Description: Supply and installation of 36" ductile iron pipe. |
Replacement of GAC at Pi’iholo WTP
Project Location: Wailuku, HI
Project Description: Replacement of 120,000 pounds of LGAC and commissioning of the LGAC system for return to service. |
Turn-Key Media Services for CIM Men's WTP
Project Location: California Institution for Men (CIM) Chino, CA Water Treatment Plant
Project Description: LGAC changeout of six 20,000-pound vessels. |
Tinker Air Force Base Infrastructure Project
Project Location: Tinker AFB, OK
Project Description: Two prepackaged lift stations (6-foot and 10-foot) and more than 30,000 feet of underground pipeline materials. |