Cottage Grove Municipal Treatment System
|
Project Location: Cottage Grove, MN
Project Description: The AV team provided three 12-foot diameter model 12-1340 GAC/IX (dual media capable) systems with using the Norit 1240PLUS GAC approved by the Minnesota Department of Health. |
Drought Conditions Push LADWP to Build Two 1-4 Dioxane Treatment Plants with VOC and Peroxide Quenching Post Treatment
Project Location: North Hollywood, CA
Project Description: AV’s GAC Vessels included fifty-four (54) 12-foot diameter vessel GAC PF 12-1240 Vessel with the taller size shell heights accommodate approximately 40,000 lbs. of carbon, both using coconut carbon to reduce VOCs and catalytic coconut carbon for peroxide quenching. The microporous structure of coconut carbon provides more surface area for adsorption and the catalytic function. |
Severe Drought Impacts Ability of Zone 7 Water Agency to Meet Proposed 20 ppt pfhxs Levels
Project Location: Pleasanton, CA
Project Description: AV designed, manufactured, delivered, offloaded, and assembled three (3) 12-520 LowPro® IX systems, on-site process pipe, resin, prefiltration equipment meeting NSF 61 standards. |
GAC Systems Help Municipalities and Utilities Protect Water Users in Norwalk, CA
Project Location: Norwalk, California
Project Description: AV designed, manufactured, delivered, offloaded, and assembled two (2) PF 12-520 GAC systems for drinking water, two (2) Fil-Trek Cartridge Filters and the above ground site pipe connecting the filters, meeting NSF 61 standards. |
Central California Winery Removes 1,2,3-TCP from Well Water Using Granular Activate Carbon
Project Location: Central California
Project Description: Designed, manufactured and delivered two (2) 12-ft. diameter and delivered two (2) 10-ft. diameter GAC systems. |
City of Tucson Treatment Plant Expansion
Project Location: Tucson, AZ
Project Description: Designed, manufactured and delivered two (2) 12-ft. diameter GAC systems. |
Treatment Train Removes 1,2,3-TCP and Nitrates in Monte Vista Water District
Project Location: Monte Vista, CA
Project Description: Designed, manufactured, delivered, offloaded and assembled six (6) PF 10-820 GAC systems for drinking water, meeting NSF 61 standards. |
City of Lodi Employs GAC to Remove Contaminants From Groundwater
Project Location: Lodi, CA
Project Description: Designed, manufactured and delivered four (4) PF12-520 GAC Systems (12-ft. diameter vessels GAC lead-lag pair for drinking water meeting NSF 61 standards). |
Town of Marana PFAS Removal Treatment Plant
Project Location: Marana, AZ
Project Description: Designed, manufactured and delivered four (4) PF12-520 GAC Systems (12-ft. diameter vessels GAC lead-lag pair for drinking water meeting NSF 61 standards). |
Shaw Air Force Base uses IX for PFAS Removal
Project Location: Oakland, SC
Project Description: Designed, manufactured, delivered, and installed one (1) of our PF12-520 IX Systems (a 12-ft.-diameter vessel IX lead-lag pair for drinking water meeting NSF 61 standards). |
City of Orange PFAS Treatment System
Project Location: Orange, NJ
Project Description: Designed, manufactured, delivered and installed one (1) of our PF12-520 IX Systems which is a 12-ft.-diameter vessel IX lead-lag pair for drinking water meeting NSF 61 standards. |
Yorba Linda Ion Exchange Treatment Plant for PFAS
Project Location: Yorba Linda, CA
Project Description: Designed, manufactured, and delivered eleven (11) of our PF12-520 IX Systems which is a 12-ft.-diameter vessel IX lead-lag pair for drinking water meeting NSF 61 standards. |
San Gabriel Valley Water Company W6 PFAS Removal
Project Location: Whittier, CA
Project Description: Designed, manufactured, delivered, offloaded, set, and assembled three 12-foot diameter ion exchange resin systems for PFAS Removal. |
Eastern Municipal Water District Well 59 PFAS Removal
Project Location: Perris, CA
Project Description: Designed, manufactured, delivered, and installed two 10‐foot diameter GAC systems for PFAS removal. |
California Water Services for TOC Removal
Project Location: Kernville, CA
Project Description: Design, fabricate, and install one 10-foot diameter GAC system to address TOC removal. |
Manufacturing Partner for a Southern CA Aerospace Defense Water Treatment Facility
Project Location: Southern California
Project Description: AV provided system design, manufacture, and supply of four large 12-foot diameter systems with a combined 320,000 pounds of GAC. |
1,2,3-Trichloropropane (TCP) Mitigation Project
Project Location: Tulare, CA
Project Description: Design, manufacture, and supply four Low Pro 12-foot diameter 40,000-pound GAC systems. |
OSHG Systems for Countywide Water Treatment Plants
Project Location: Maui, HI
Project Description: Design, deliver, install, and commission On-Site Sodium Hypochlorite Generation (OSHG) Systems. |
Per-Fluorinated Chemical Treatment System
Project Location: Stuart, FL
Project Description: Design, fabricate, and install two 12-foot diameter ion exchange systems for PFAS removal. |
Margarita Well #2 GAC Treatment Facility
Project Location: San Dimas, CA
Project Description: Design, fabricate, and install one patent pending Low Profile 12-foot diameter GAC system for 1,2,3-TCP removal. |
Department of Energy TOC Removal Project
Project Location: Northern California
Project Description: Design, fabricate, and install one 8-foot diameter GAC system, system header and bypass piping, activated carbon media, and chemical feed systems. |
Chino Basin VOC Plant Design Build Project
Project Location: Pomona, CA
Project Description: Four 12-foot diameter GAC systems, system header and bypass piping, and activated carbon media for 1,2,3-TCP/VOC removal. |
Nut Plains PFOA/PFOS Well Treatment System
Project Location: Rancho Cordova, CA
Project Description: Two 10-foot diameter Ultra Low Profile GAC systems, system header, and bypass piping for PFAS removal. |
Dunnigan WTP Using Ion-Exchange for Chrome VI
Project Location: Dunnigan, CA
Project Description: Supply and installation of prefiltration equipment, fabricated steel and PVC manifold piping, ion exchange vessels, and sensors for controls monitoring. |
Groundwater Remediation at Vandenberg AFB
Project Location: Lompoc, CA
Project Description: Supply and installation of 8-foot diameter GAC system. |
Plant F-21 Single Pass Ion Exchange System
Project Location: Fontana, CA
Project Description: Custom design and fabrication of 8" to 18" diameter steel pipe. |
Monterey Peninsula Water Supply Project
Project Location: Monterey, CA
Project Description: Supply and installation of 36" ductile iron pipe. |
Replacement of GAC at Pi’iholo WTP
Project Location: Wailuku, HI
Project Description: Replacement of 120,000 pounds of LGAC and commissioning of the LGAC system for return to service. |
Turn-Key Media Services for CIM Men's WTP
Project Location: California Institution for Men (CIM) Chino, CA Water Treatment Plant
Project Description: LGAC changeout of six 20,000-pound vessels. |
Tinker Air Force Base Infrastructure Project
Project Location: Tinker AFB, OK
Project Description: Two prepackaged lift stations (6-foot and 10-foot) and more than 30,000 feet of underground pipeline materials. |